Search results for "亚美am8安卓版注册-【✔️网址㊙️sogou7.com✔️】-江苏福彩快3今天开奖号-利来集团f1-(✔️输入sogou7.com✔️)-亚美am8安卓版注册-亚美am8安卓版注册-乐天堂下载app-(✔️访问sogou7.com✔️)"
92 results found
Get help with capital projects
Information on how we support health boards with new builds, refurbishment, maintenance and construction.
Apply for rates and rental reimbursement
Apply for rates and rental reimbursement.
Decontamination Facilities (SHPN 13)
Scottish Health Planning Note 13 Parts 1, 2 and 3: guidance covers facilities for central, local and endoscope decontamination units
Fire Safety Precautions and Engineering (SHTM 81)
Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Primary Healthcare Premises (SHPN 36)
Scottish Health Planning Note 36 Parts 1, 2 and 3: provides advice on the design and specification requirements for Primary Healthcare Premises.
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Section II - Preventive Care and Periodontal Treatment
Section II - Preventive Care and Periodontal Treatment
Fire Safety Precautions and Engineering (SFPN 00-02 and SHTM 81 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Sterilization (SHTM 2010)
Scottish Health Technical Memorandum 2010 Parts 1, 2, 3, 4, 5 and 6: ensure that sterilizers are operated in compliance with legislation/standards
Decontamination - Washer-disinfectors (SHTM 2030 ARCHIVED)
(Arch.) Scottish Health Technical Memorandum 2030 Parts 1 to 3: guidance for WDs for processing medical devices, laboratory ware and sanitary product.